Facility and equipment
Wastewater pits, DAF units, aeration tanks, channels, piping areas, filling lines, or other visible fluid scenes.
ABYSS Application Meeting
No plant footage or drawings are required for the first meeting. We review your facility type, visible anomaly, existing cameras, and current monitoring workflow, then decide whether NDA-protected video validation is the right next step.
First
Meeting without footage upload
Then
NDA-protected video validation
PoC
One facility, one visible anomaly
Meeting Scope
The goal is to decide whether there is a concrete ABYSS theme worth validating, not to ask for confidential footage before an NDA.
Wastewater pits, DAF units, aeration tanks, channels, piping areas, filling lines, or other visible fluid scenes.
Foam, scum, oil-film-like changes, turbidity, dripping, liquid-level change, overflow, or surface-flow change.
Whether fixed cameras, recorded clips, or inspection footage exist, and whether footage can be shared after an NDA.
How to narrow the first PoC to one facility, one visible anomaly, and one operator decision.
Validation Flow
01
Align facility, anomaly, camera status, and operating context.
02
Protect footage and site details before technical review.
03
Check whether the fluid change is visible enough to validate.
04
Cut scope to one facility, one visible anomaly, one operator decision.
05
Define notification, dashboard, API, or review workflow if PoC is viable.
Booking
If the embedded scheduler does not load, open the HubSpot booking page in a new tab.